Pages

THE HISTORY OF CIVIL ENGINEER

Showing posts with label Sample Collected for CBR Test. Show all posts
Showing posts with label Sample Collected for CBR Test. Show all posts

Thursday, November 12, 2020

Sample Collected for CBR Test


 Sample

The sample shall be handled and specimen(s) for compaction shall be prepared in accordance with the procedures given in T99 or T180 for compaction in a 152.4mm (6-in) mold accept as follows:

 

If all material passes a 19.0mm (3/4 in) sieve, the entire gradation shall be used for preparing specimens for compaction without modification. If there is material retained on the 19.0-mm sieve, the material retained on the 19.0-mm sieve shall be removed and replaced by an equal amount of material passing the 19.0-mm sieve and retained on the 4.75-mm (No.4) sieve obtained by separation from portions of the sample not otherwise used for testing.

 

Bearing Ratio Optimum Water Content- From a sample having a mass of 35 kg (75 lb.) or more, select a represented portion having a mass of approximately 11kg (25 lb.) for a moisture-density test and divide the remainder of the sample to obtain three representative portions having a mass of approximately 6.8 kg (15 lb.) each.

Bearing Ratio for a Range of Water Content-From a sample having a mass of 113 kg (250 lb.) or more, select at least five representative portions having a mass of approximately 6.8kg (15 lb.) each for use in developing each compaction curve.


WhatsApp on Friday delayed a data-sharing

WhatsApp on Friday delayed a data-sharing change as users worried about privacy fled the Facebook-owned messaging service and flocked to riv...